Decomposing — cutting work into pieces

Load when: a task is too big for one run, spans more than one craft, or needs several things done before one of them can start.

A task must fit one run. Work that cannot finish in one is decomposed, not hoped through. That is the first reason to cut, and the only one that is not a judgement call.

Children are tasks

Not checklist lines. The test is unchanged: a unit of work has an assignee, a thread, runs and a cost; a checklist line has none of those. So a child gets the same id, the same fields, the same history and its own thread — at every depth.

Flat directory, hierarchy in a field. parent is a value, not a folder, so re-parenting is a one-line edit rather than a file move that breaks every inbound link.

Depth is allowed, and three things keep it honest

Nest as deep as the work is: a task, a child, a child of that. The old one-level limit came from a system where the barrier was a number on the child, and depth broke it. Here the barrier is the wave and waves are per parent, progress is the same computation at every level, and the board is generated — so depth costs nothing structurally.

What it does cost is honesty, and three rules pay for it:

Every level carries a real definition of done, or it is a folder pretending to be work. This is the same test that decides whether a parent may close itself, which is a good sign it is the right test.

"Own" and "including children" are labelled, always. At depth, "this cost N" without the label gets more wrong with every level.

An audit flags a tree deeper than three as a smell, not a violation. Usually it means a piece has outgrown being a piece.

Promote what outgrew itself; do not nest deeper (./patterns §23). When a child needs children of its own and a life of its own, it stops being a child — it becomes a task in its own right (templates/TASK-template.md): remove the parent link and it is a task. One field, and every link still resolves because links point at the id.

Waves — the barrier

A wave is a barrier, not a queue. Everything genuinely independent goes in the same wave and runs together; the numbers order dependencies, not tasks.

parent: T-8F3KQ2
  wave 1  index the data                    backend
  wave 1  build the acceptance set          analyst
  wave 1  design the empty and error states designer
  wave 2  ranking against the acceptance set backend
  wave 3  review: code                       QA
  wave 3  review: design and accessibility   design lead

Wave 1 has three items because none needs the others. Ranking is wave 2 only because it genuinely needs the index. Wave 3 is two rows rather than one because a gate that can independently reject the work is its own child with its own single owner — that is what makes gates parallel instead of a queue.

Two children in the same wave never own the same file. This is what makes a wave safe to run in parallel, and it is decided at decomposition, not discovered at merge.

Completing a wave does not start the next one. It surfaces as ready and waits, like every other transition.

wave, not stage. One word cannot mean both the step of a pipeline and the parallel group; the corpus that used one word for both paid for it.

Who cuts, and who ends up owning

Decomposition belongs to whoever owns the outcome — the split is a judgement about the work, and only the owner of the result has it.

Children are addressed to groups, and routing runs again — possibly into other groups entirely → ./addressing.

Leaves have owners; parents may not. A parent spanning several crafts is nobody's craft, so it stays unassigned, and that is the shape rather than a defect. It gives one testable invariant: an unassigned leaf is a finding; an unassigned parent with children is normal. A group in the assignee field means "not decided yet", which is legitimate on a parent and a finding on a leaf.

The advisor never holds it. Where nobody owns the outcome yet, it decomposes and hands each child to a real owner — then leaves the picture.

The build produces what the review needs

Whatever the reviewer must see to judge it is produced by the builder: screenshots of every state, a recording, the numbers before and after, the command that reproduces it.

Without it the review gate has nothing to review and bounces the work — which costs two runs instead of one and looks like a quality problem when it is a handoff problem.

Gate only what a unit of work can violate. A gate that checks something no single piece controls will fail on pieces that did nothing wrong, and people learn to route around it.

Sizing

Too small and coordination costs more than the work. Too large and the piece runs a long time before anyone can tell whether it is going anywhere. Right is a self-contained unit producing a clear deliverable — a screen, a test file, a review, a decision.

Start low on grade when difficulty is unclear and let the review gate return "needs a higher grade"./hiring. Guessing the grade before the work is a guess; failing the review is information.