Grouping — releases, milestones, order and progress
Load when: planning what ships together, marking a checkpoint, reordering the backlog, or answering "how far along are we".
Release and milestone are different things
| Release | Milestone | |
|---|---|---|
| What it is | a shipment | a checkpoint |
| Leaves the building | yes | maybe nothing does |
| Has a version | yes | no |
| Gets measured afterwards | yes | no |
| Target date | yes | optional |
"Data migrated" and "first ten customers onboarded" are milestones: real progress, nothing shipped. Forcing a date onto "when it's done" produces theatre, so the date is optional and its absence is not a defect.
They are orthogonal, not nested. A task carries a release and a milestone independently. Neither contains the other, because containment would create two paths from a task to a group — directly and through the other — and two paths to one fact drift.
Which releases closed a milestone is derived, not stored: a generated block lists the releases its tasks landed in. That gives "Alpha closed across v0.1–v0.3" with no second membership path.
A milestone that outgrew itself is promoted, not nested (./patterns §23) — it becomes a release, and the tasks under it keep their ids → ./shipping. Spanning many releases and months usually means it has become an initiative in everything but name — and promoting it costs one field, while nesting it costs a level in every rollup forever.
Progress is derived, never stored
The same computation at every level — subtask, task, milestone, release, project. Something with no children has no progress block.
It counts items and says so. "Five of nine", never "56% done" — the nine are not equal, and a percentage claims they are.
Canceled and triage leave the denominator. Work that was dropped is not progress you failed to make, and intake nobody has decided on was never committed.
Show what is unassigned. A denominator that includes work nobody owns reads as progress that is merely slow.
Report pace, not position. "Three closed this week, six left" answers a different and better question than "56%".
The parent never closes itself — unless it carries no definition of done of its own, in which case it is a folder → ./decomposing.
Scope movement is recorded, because otherwise progress appears to go backwards. Add four tasks to a milestone and "5 of 9" becomes "5 of 13": honest, and unreadable as anything but a team that stalled. So joining or leaving a group is an entry in the task's history, and the progress block shows two numbers: how much is done, and how much the total has grown since it was set. Closing work and adding work then look like the different things they are.
Order is one hand-kept list
Priority is not the order — it is a property of one item; order is a relation between items. Two sources of order drift within a week and then nobody knows which is true.
So the real order between items lives in one list the owner keeps, and everything else — priority, dates, scores — is input to it rather than a competing answer.
Dates beat priority, and dates and scores answer different questions. A score ranks what is worth doing; a date says when it stops being optional; an external commitment wins outright. Say which rule applied, out loud, when they disagree.
Prioritisation is the decision loop with numbers
This is the one place unsourced figures slip in wearing the clothes of rigour.
Pick the framework per task and say why. ICE by default — impact, confidence, ease — because it needs no data a small project does not have. Reach for another when its question is the one being asked, and the names are given here as well as the shapes, because an owner who knows the name should not have to recognise a paraphrase:
| Framework | The question it answers | Reach for it when |
|---|---|---|
| ICE (default) | which of these is worth doing first | there is no reach data and the list is short |
| RICE | which reaches more people per unit of effort | reach is known and sourced — invented reach makes it ICE with extra arithmetic |
| WSJF | what to do next when everything is wanted | there is a real constraint and delay has a cost that differs per item |
| Kano | whether to build it at all | the argument is delight versus table stakes, not order |
| MoSCoW | what fits in a scope somebody is negotiating | the conversation is with a client or a date |
| Eisenhower | what a person does today | the list is somebody's day, not a product's roadmap |
A framework the user names is researched and applied the same way — the list is seeds, not a ceiling. And if the named one is wrong for this task, say so with an alternative: disagreeing when the evidence disagrees is the same law here as anywhere. Never run two and pick the flattering answer — the framework is chosen before the scores, or it is a way of arriving where you were already going.
Every score cites its basis or is marked a judgement call. Impact from analytics, tickets or revenue; ease from comparable past work in the ledger. A number with no basis is an opinion formatted as data — and formatting is precisely what makes it persuasive.
Then test whether it survives being wrong: move each score by one. If the top reorders, the result is undecided, and reported as undecided — not presented as an answer. This is the decision loop's "check it survives being wrong" step, applied where it is easiest to skip.
Close the loop when the work lands. Compare the impact predicted with the impact that arrived. Without that, scoring never improves — it just accumulates.
Releases
Group tasks into a shipment, cut it, measure it. The ritual is in ./shipping; what belongs here is the surgery:
Cutting a release sends its unfinished items back to the backlog rather than deleting them. Extending one pulls items in explicitly. Reprioritising re-runs the scoring pass over the set. All three are ordinary decisions with reasons, and a slip is a recorded decision, never a silent edit to a date.
Batch, don't drip → ./shipping. Pool small changes; ship an urgent one alone.
Version with meaning: a patch fixes without changing instructions, a minor adds a capability, a major means existing projects must do something differently — and the changelog says which, because it is the migration map.
Non-code work has no branches: the version is a date or an edition. The batching and the audience-facing note are identical.